Operation “Paint The Bathroom”
Phase one of Operation “Paint The Bathroom” (to be known as OPTB) has been completed. As of 1755 Hours, all the light fixtures, trim plates, curtain rods, towel bars, and other miscellaneous removable items have been taken down in preparation for Phase Two which will commence tomorrow at 1700 Hours.
Basically, Phase Two is patching holes and I don’t have a putty knife to use for spackling the four million holes that adorn the walls of the downstairs bathroom. Why, exactly, there would be so many holes in the walls of any bathroom is completely beyond me.
Tomorrow at lunch I’ll go to Lowe’s and pick up the following:
- Putty Knife
- Sandpaper
- Mirror Mounting Clips
- Caulk
- Caulk Gun
- Shower Curtain Rod Flanges
- Shower Curtain Rod Cover
- Light Switch Plate
- GFI Outlet Plate
- Towel Bar
- Shower Curtain Liner
- AC Vent Register (11.5 x 3.125)
- Paint
Hopefully I can count on Ginny to provide basic painting supplies. The goal is to have the room entirely prepped for painting by Saturday.
Leave a Reply